How to Write a Grounds Maintenance RFP: A Step-by-Step Guide
Quick Summary
A grounds maintenance RFP is a request for proposal sent to contractors for quotes on looking after your outdoor site. Write it by mapping each zone, listing tasks and frequencies, setting measurable standards, and defining how bids will be scored.
Split the site into named zones and list tasks and frequencies for each.
Use measurable standards, such as grass height kept between 35 and 50 millimetres.
Weight bid criteria, for example price at 40% and method statement at 25%.
Ask every bidder to price the same scope using the same schedule.
Consider a 12-month initial contract with a review period before committing longer.
Table of Contents
What a Grounds Maintenance RFP Is For and Who Should Write It
A grounds maintenance RFP (request for proposal) is the document you send to contractors when you want quotes for looking after your outdoor site. It sets out what you need done, how often, and how you will judge each bid. Done well, it helps you compare bids on the same scope.
Facilities managers, office owners and business park administrators usually write these documents. If your site has a shared car park, tree lines and planting beds, the RFP is the tool that keeps everyone bidding on the same job.
Office building owners with recurring grounds needs
Facilities managers at business parks
Administrators of private office complexes
Business owners managing their own commercial property
Watch out: Vague wording such as "tidy the grounds" lets each bidder price a different job. Write tasks, frequencies and standards in plain terms.
Setting Out the Scope of Work Site by Site
The scope of work is the heart of your RFP. It tells contractors exactly which areas they are pricing. Start by walking the site with a notepad and a site plan. Note every lawn, bed, path, car park and tree.

Mapping Areas, Frequencies and Seasonal Tasks
Split the site into named zones, such as "front entrance", "north car park" and "west planting bed". For each zone, list the tasks and how often they happen. Mowing might be weekly from April to October, while leaf clearance is needed only in autumn.
A simple table helps:
Zone | Task | Frequency | Season |
Front lawn | Mowing and edging | Weekly | April to October |
Planting beds | Weeding and mulching | Monthly | Year-round |
North car park | Sweeping | Fortnightly | Year-round |
Boundary trees | Pruning and inspection | Annually | Winter |
Give contractors your seasonal timing too. Contractors who know that spring planting must happen before a set date can price that work accurately.
Defining Car Park, Tree and Clearance Requirements
Car parks, trees and clearance work need their own clear rules. For car parks, state the area in square metres, the sweeping method and whether you need litter picking before client meetings. For trees, name the species where you know them and say whether work needs written approval before it starts.
Clearance covers fallen branches, leaf debris and rubbish left at boundaries. Say how quickly it must be removed after a storm. A clear response time can help avoid disputes later.
If your site needs a wider service, such as tree surgery, cleaning and clearance under one contract, say so. Bundled bids are often easier to compare than several separate quotes.
Building a Grounds Maintenance RFP Template Your Team Can Reuse
A template saves time when you tender for more than one site. Keep the same headings every time, and change only the site details. Your template should include the scope, service standards, bid evaluation criteria, contract length and submission deadline.
Store the template in a shared folder so future tenders start from the same base. Review it after each contract. Questions from bidders can show where the wording was unclear.
Defining Service Standards and Site Visit Expectations
Standards tell contractors what "done" looks like. Instead of "keep lawns neat", write "grass height kept between 35 and 50 millimetres, with clippings removed after each cut." Measurable standards make it easier to check the work.
Include site visit expectations too. State how many visits per month you expect, which days suit you, and whether attendance must be logged. If you need work finished before client meetings, say which day and time.
Explain how you will report problems. A named contact and a set response time for urgent issues protect both sides.
Setting Bid Evaluation Criteria That Compare Like With Like
Bid evaluation criteria tell bidders how you will score their proposals. Without them, you are left comparing prices alone, which can hide poor service. Give each criterion a weighting, for example:
Price: 40%
Method statement and approach: 25%
Relevant experience and references: 20%
Insurance and health and safety training: 15%
Ask every bidder to price the same scope, using the same schedule. If one contractor quotes for weekly sweeping and another for fortnightly, the prices cannot be compared directly.
Check that bidders hold appropriate public liability insurance. Ask each bidder to provide a short checklist of insurance documents with their bid.
Questions to Ask Grounds Maintenance Contractors Before You Award
Before you award the contract, ask each shortlisted contractor the questions that matter most. Good questions reveal how they will work, not just what they charge.
How will you cover the site if a team member is absent?
Who is the named account manager for this contract?
What is your process for reporting missed visits?
Will you use subcontractors, and if so, how will you vet them?
What happens if a seasonal task falls behind schedule?
Ask for references from similar sites. Speaking to a previous client can tell you more than a written reply.
Issuing Your RFP and Choosing Your Next Grounds Contractor
Once your RFP is ready, send it to at least three contractors. Set a clear deadline for questions and another for submissions. Give bidders time to visit the site before they price.
When bids arrive, score them against your criteria and check the references. Shortlist the strongest two or three, then arrange interviews or site meetings. The cheapest bid is not always the best value. Choose the contractor whose method, experience and communication fit your site.
Many buyers choose to award an initial 12-month contract with a review period built in, which gives a fair test of service before committing to a longer term.
Frequently Asked Questions
What should a grounds maintenance RFP include?
A useful grounds maintenance RFP sets out the site address and plan, a description of each area to be maintained, the services required and how often, service standards, the contract term and start date, submission deadlines, and how bids will be scored. It should also state your insurance and health and safety requirements, and ask suppliers to confirm their site visit availability. Pricing should be requested in a consistent format, such as a schedule of rates with separate lines for regular visits and one-off work, so that bids can be compared fairly. Keeping the document specific to your site avoids vague quotes that are hard to compare later.
How do you write a scope of work for grounds maintenance?
Write the scope of work area by area. For each zone, list the tasks, such as mowing, edging, hedge cutting, bed weeding, litter picking, leaf clearance and car park sweeping, along with the frequency and any timing constraints. Note seasonal work like planting or pruning separately, and specify any days or times that must be avoided, for example before client meetings. Attach a site plan marking each zone. The clearer the scope, the less room there is for disputes over what was included in the contract price.
How should grounds maintenance bids be evaluated?
Score bids against criteria you set in advance and publish in the RFP. Common headings include price, relevant experience with commercial sites, the proposed team and how supervision will work, service standards and quality assurance, health and safety arrangements, and how the contractor will handle sickness or extra demand. Weight the criteria so that price does not automatically win on the lowest figure. Compare bids using the same scope, as a low price often means fewer visits or less scope included.
What questions should you ask grounds maintenance contractors?
Ask how they will guarantee consistent attendance if other work becomes busy, who will carry out the work day to day, and whether any work will be subcontracted. Ask how they handle missed visits and what the remedy is, how they report completed work, and how they will adapt to your specific requirements such as seasonal planting or set weekday schedules. Ask for references from comparable private sites and confirm their insurance and health and safety training. Their answers reveal how the service will run once the contract starts.




Comments